Midway Road (County Road 712) Widening Projects
Midway Road / Jenkins to Selvitz Road
Public Workshop, July 14, 2021, Documents
Design Documents
- Roll Plot from Jenkins Road to Selvitz Road _ FPID: 231440-5-52-01
- Roll Plot from Glade Cut Off Road to Jenkins _ FPID: 231440-4-52-01
- Moving Florida Forward / Midway Road Rendering
Project Development and Environment (PD&E) Study Documents
Technical Documents
- Contamination Screening Evaluation Report (CSER)
- NESHAP Asbestos Survey and Lead Based Paint Report
- Endangered Species Biological Assessment (ESBA)
- Preliminary Roadway Soil Survey Report
- Cultural Resource Assessment Survey
- Desktop Analysis of Three Potential Pond Sites
- Type 2 Categorical Exclusion Determination Form
- Draft Noise Study Report
- Preliminary Engineering Report
- Design Traffic Technical Memorandum
- Air Quality Screening Report
- Interchange Feasibility Report
- Utility Assessment Report
- Wetland Evaluation Report
- Location Hydraulic Report
- Pond Siting Report
- Determination of Applicability (DOA)
- DOA Appendices
Midway Road Public Hearing Presentation Video
Public Hearing held on January 19, 2017
- Alternatives Evaluation Matrix
- Compliance Laws Midway Road
- Environmental Review Midway Road
- Recommended Roadway Alternative 2
- Typical Section Bridge - Recommended
- Typical Section Recommended Roadway Alternative 2
- Newsletter 3, January 2017
- Public Hearing Comment Sheet
Alternatives Workshop held on June 28, 2016
- Alternatives Meeting Welcome Sign
- Alternatives Meeting Presentation 06-28-16
- Newsletter 2
- Alternatives 1 Typical Section Board
- Alternatives 2 Typical Section Board
- Typical Bridge Section Board
- Alternatives 1 Roll Plot Board (large file)
- Alternatives 2 Roll Plot Board (large file)
- Alternatives Evaluation Matrix Board
- Comment Form
Kick-off Meeting held August 18, 2015
- Kick-off Meeting Welcome Sign
- Kick-off Meeting Presentation 08-18-15
- Kick-off Meeting Board
- Newsletter 1
- Comment Form